Every crane move,
orchestrated.
Berth compresses vessel turnaround, sequences crane operations, and eliminates dwell-time penalties across terminals handling 40,000+ TEU per week.
The gap between manual
and automated is widening.
Port congestion cost global trade $56B in 2025. Terminals still running manual TOS are falling behind peers by every measurable KPI.
Source: UNCTAD Port Performance Scorecard 2025 · Berth Terminal Analytics Q4 2025 · n=340 terminals
28.5 hours becomes 11.2.
The same vessel. The same cargo.
Berth's sequencing engine pre-stages crane assignments before the vessel enters the approach channel. Parallel operations replace sequential queuing.
Pre-Arrival Sequencing
Crane assignments locked 4 hours before vessel arrival based on stowage plan ingestion.
Parallel Discharge / Load
Simultaneous discharge and load operations across bow, midship, and stern crane groups.
Yard Pre-positioning
Straddle carriers pre-position outbound containers to quay buffers during inbound discharge.
Dynamic Re-sequencing
Live adjustment to crane order when vessel trim, weather, or equipment changes mid-operation.
Build your board case
in four assumptions.
Adjust the inputs to match your terminal's profile. The model uses Berth's measured performance averages from 14 live deployments.
Terminal Assumptions
Board-Ready Output
Model based on Berth deployment data across 14 terminals (2024–2025). Individual results vary. Full methodology available in Terminal ROI Model download.
Named terminals.
Audited numbers.
Every figure below comes from a live Berth deployment. Hover each card to see the before-and-after.
Port of Felixstowe — Berth 9
28,400 TEU/wkAPM Terminals Maasvlakte II
52,000 TEU/wkDP World Jebel Ali — T3
44,800 TEU/wkPSA Singapore — Tuas Phase 1
61,200 TEU/wk67% of top-100 terminals
are already automated.
The remaining third are not deciding whether to automate. They're deciding how far behind to fall. Berth compresses the migration window from 18 months to 90 days.
Source: Drewry Port Automation Tracker 2025 · UNCTAD Technology Readiness Index · Berth Research
See Berth running
on your terminal profile.
A 40-minute technical demo configured to your TEU volume, berth count, and crane fleet. No slides. Live system.
- ▸Live crane sequencing engine demonstration
- ▸Your KPI assumptions pre-loaded from ROI model
- ▸TOS migration timeline for your infrastructure
- ▸Security and integration architecture review
Download the
Terminal ROI Model.
The full financial model behind the calculator above — with sensitivity tables, peer benchmark data, and a board-ready executive summary. Used by 340+ port authorities.